某市A片区市政工程顶管设计与施工案例分析
基金项目(Foundation):
邮箱(Email):
DOI:
投稿时间: 2024-03-07
投稿日期(年): 2024
修回时间: 2024-04-03
终审时间: 2025-12-19
终审日期(年): 2025
审稿周期(年): 2
发布时间: 2026-04-15
出版时间: 2026-04-15
移动端阅读
摘要:

以某市A片区市政工程顶管设计与施工为例,分析在顶管设计及施工过程易出现的问题,并给出具体的处理措施及控制方法。A片区通过建设DN3000大口径雨水联通管,解决了面源污染和积水内涝以及改善河道水质和生态环境。为今后工程设计与施工提供参考依据。

Abstract:

Taking the design and construction of municipal engineering pipe jacking in Area A of a certain city as an example, this paper analyzes the problems that are prone to occur during the pipe-jacking design and construction process, and provides specific treatment measures and control methods. The construction of DN3000 large-diameter rainwater connection pipes in Area A has solved non-point source pollution and waterlogging, as well as improved river water quality and ecological environment. It provides a reference basis for future engineering design and construction.

基本信息:

中图分类号:TU990.3

引用信息:

[1]汪健,杜岚,许双堆.某市A片区市政工程顶管设计与施工案例分析[J].云南水力发电,2026,42(04):58-61.

投稿时间:

2024-03-07

投稿日期(年):

2024

修回时间:

2024-04-03

终审时间:

2025-12-19

终审日期(年):

2025

审稿周期(年):

2

发布时间:

2026-04-15

出版时间:

2026-04-15

检 索 高级检索