以某市A片区市政工程顶管设计与施工为例,分析在顶管设计及施工过程易出现的问题,并给出具体的处理措施及控制方法。A片区通过建设DN3000大口径雨水联通管,解决了面源污染和积水内涝以及改善河道水质和生态环境。为今后工程设计与施工提供参考依据。
Abstract:Taking the design and construction of municipal engineering pipe jacking in Area A of a certain city as an example, this paper analyzes the problems that are prone to occur during the pipe-jacking design and construction process, and provides specific treatment measures and control methods. The construction of DN3000 large-diameter rainwater connection pipes in Area A has solved non-point source pollution and waterlogging, as well as improved river water quality and ecological environment. It provides a reference basis for future engineering design and construction.
[1]楼少华,唐颖栋,陶明,等.深圳市茅洲河流域水环境综合治理方法与实践[J].中国给水排水,2020, 36(10):1-6.
[2]陈孝湘,贺雷,孙清,等.分节预制式多曲线顶管的顶力估算公式[J].地下空间与工程学报,2021, 17(3):800-807.
[3]邓欢,胡平,敬欣雨.浅析顶管施工安全技术管理要点[J].四川建筑,2023, 43(4):273-275+278.
[4]李洪武.城市给排水项目施工阶段顶管技术的具体应用分析[J].科技资讯,2023, 21(20):142-145.
[5]GB 50268—2008给水排水管道工程施工及验收规范[S].
[6]CECS246:2008给水排水工程顶管技术规程[S].
[7]赵康康,廖志兴,陈磊.大直径原水管改迁顶管施工控制及纠偏技术[J].云南水力发电,2021, 37(12):218-220.
[8]马保松,张雅春.曲线顶管技术及顶力分析计算[J].岩土工程技术,2006, 20(5):229-232+259.
[9]王再斌,李彪.市政顶管工程常见施工技术问题研究[J].云南水力发电,2022, 38(7):11-15.
[10]杨东升,李兴冯.市政污水顶管在复杂地址段顶进的施工经验[J].云南水力发电,2022, 38(9):11-15.
基本信息:
中图分类号:TU990.3
引用信息:
[1]汪健,杜岚,许双堆.某市A片区市政工程顶管设计与施工案例分析[J].云南水力发电,2026,42(04):58-61.
2024-03-07
2024
2024-04-03
2025-12-19
2025
2
2026-04-15
2026-04-15